Elks Building

Jackson, TN

Roof System: Built Up Roof
Manufacturer: Johns Manville
Installed: August 2004

This roof was removed down to the wood deck, the deck was repaired and a base sheet was installed. A 3/4 inch insulation was mopped down and then the new Built Up Roof was installed. This job was very messy due to the amount of storm debris on the roof.

Photos show roof tear off of tornado damaged roof and installing new roof.

Union Planters Bank

Humboldt, TN

Roof System: Standing Seam Metal Roof
Manufacturer: Englert
Installed: November 2004

The existing metal roof had a hidden box gutter leaking down the outside walls of the building and into the offices. The old roof was removed and the rotten wood was removed and repaired. We then installed a new Standing Seam metal roof.

First Citizens National Bank

Dyersburg, TN

Roof System: SBS Aluminum Roof Coating
Manufacturer: Karnak
Installed: August 2006

The existing built up roof was showing signs of some hail damage. The hail damage was patched with plastic roof cement then a SBS aluminum roof coating was installed over the complete roof.

Troy United Methodist Church

Troy, TN

Roof System: SBS Aluminum Roof Coating
Manufacturer: Karnak
Installed: August 2006

The Church was having problems with leaks and wanted to solve the problem permanently. The shingle roof was removed and a new standing seam roof was installed.

Briggs and Stratton

Newbern, TN

Roof System: Mechanically Attached TPO
Manufacturer: Versico
Installed: September 2007

The roof on the building was a spray polyurethane foam that was un-repairable. We retro-fited the building with a 1 inch polyisocyanurate roof insulation and installed a .045 mil mechanically attached white TPO roofsystem.